FR10 restart with a block already in the destination

NinaChen1197 · 13 Dec 2025, 20:19 UTC

Closed
NI
NinaChen1197
I can't rely on our saved pocket after an interrupted transfer. On the bench the block had reached its destination, but restarting the FR10 job offered the same placement again. I've kept the job out of production. What should the integrator define besides moving the point where the pocket gets saved?

1 reply

JO
JonasAbbott0024
Replying to NinaChen1197

Ask how the program represents an uncertain transfer and how the physical state is reconciled before continuation, including who does that work; saving earlier can create a different mismatch, so I would want the stop points walked through rather than one line moved and called recovery.

12 points

Discussion closed