简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

I cannot accept switch it on as the FR5 damage assessment

OwenBaker0486 · 2026年8月20日 13:58 UTC

回复讨论
OW
OwenBaker0486
Our FR5 for lightweight-fixture loading arrived with a crushed crate corner, displaced supports and visible damage near the controller enclosure; I have kept it unpowered, photographed the delivery and retained the packing, but the seller in China has answered only that I should switch it on.

3 条回复

TH
ThomasBrown0886

Do not power visibly damaged equipment to provide their requested proof; ask for a qualified inspection arrangement and written handling instructions tied to the serial and damage photographs, while keeping the delivery evidence intact.

16
OW
OwenBaker0486

Their service contact has now arranged an inspection at our bench and acknowledged the enclosure damage in writing; the appointment is arranged, not completed, and the FR5 remains unpowered.

14
TH
ThomasBrown0886

Ask the inspector to distinguish visible transport damage, any further findings and the work needed before energisation, rather than give purchasing a single inspected tick that everyone reads differently.

0

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。