I have a drawing of the short blank at the fixture, but no gripper around it and no door beside it. The proposed FR10 stand is also where our setter normally brings the replacement fixture.
Can I ask for the loading path and the setter's exchange arrangement in one layout comparison? I don't want the handover to reveal that the arm fits only while nobody changes the job.
How do I include fixture exchange in our FR10 access comparison?
LuisBell0695 · 23 Apr 2026, 01:42 UTC
0 replies
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .