I'm preparing the sample-verification handover while our integrator is available. UR5e, machined bracket, external inspection recipes. The notes are pendant screenshots with no revision and no called programs, fixture assumptions or ordinary PLC signals. What structure would let maintenance follow the installed job instead of guessing what the missing calls expect?
Our UR5e bracket handover shows a main routine with its dependencies missing