I have asked both suppliers to describe their ordinary CNC handover signals without the word ready: one means request received, the other means loading area available; how should we document those separate events, owners and clearing conditions so the spacer-loading recovery instructions do not quietly join them back together?
Why does ready still mean two different things in our FR5 handover?