Application safety assessor

HarishArcher0402

Harish Archer

HA
South West EnglandJoined 12 Jul 202664 posts

About

Application safety assessor. Currently exploring plc integration and fairino robots. Working around limited floor space; planning a 8-week trial before making a decision.

PLC integrationFairino robots

Conversations

H

A small owner-run workshop: I priced Universal Robots UR5e, then the budget argument started

HarishArcher0402 · 20 points · Buying advice · 2 Sept 2026
5replies
H

The supplier says softer pads will help. How do I assess that? (planning gentle handling of cylindrical components)

HarishArcher0402 · 8 points · Buying advice · 31 Aug 2026
19replies
C

Planning for 186 without pretending every cost is known (Fairino FR5, boxed product placement)

ClaraBrown0872 · 23 points · Buying advice · 30 Aug 2026
18replies
H

A PLC-coordinated inspection cell: Same job label, wrong attempt marked complete

HarishArcher0402 · 11 points · Programming & support · 30 Aug 2026
1replies
E

What should I ask suppliers for beyond a payload total? (moving rigid components into assembly fixtures)

EmmaAbbott0028 · 23 points · Buying advice · 28 Aug 2026
19replies
H

A supervised handling workshop: Would you arrange an independent inspection here?

HarishArcher0402 · 29 points · Buying advice · 26 Aug 2026
7replies
H

Keeping failed checks in history without counting every retry - per-item inspection

HarishArcher0402 · 36 points · Applications & integration · 26 Aug 2026
11replies
F

How do I get the agreed FR5 pad demonstration, not another general motion video?

FionaAbbott0064 · 30 points · Buying advice · 23 Aug 2026
16replies
H

My FR10 adapter interface differs from the configuration I confirmed

HarishArcher0402 · 4 points · Buying advice · 22 Aug 2026
14replies
H

Fifty days after delivery, service still has not acknowledged my returned FR5 controller

HarishArcher0402 · 4 points · Buying robots from China · 17 Aug 2026
17replies
C

Why does our bracket proposal jump from restrained alignment straight to corrected acceptance?

ClaraAli0176 · 27 points · Applications & integration · 16 Aug 2026
14replies
H

Our FR5 inspection request can vanish between observations

HarishArcher0402 · 17 points · Applications & integration · 15 Aug 2026
13replies
H

How do I connect a collection booking to our crate? - loading inspection fixtures

HarishArcher0402 · 5 points · Buying robots from China · 12 Aug 2026
5replies
H

Fairino FR10: A late result fools our job handler

HarishArcher0402 · 25 points · Programming & support · 4 Aug 2026
16replies
H

Small production workshop: Does a warehouse reference mean the robot is there?

HarishArcher0402 · 29 points · Buying robots from China · 3 Aug 2026
12replies
H

The vacuum report shows a seal, but how many panels leave the stack?

HarishArcher0402 · 21 points · Applications & integration · 30 Jul 2026
0replies
H

I liked the trial, but the demonstrator did most of the preparation (Universal Robots UR5e, fixture-to-tray transfer)

HarishArcher0402 · 22 points · Reviews & comparisons · 22 Jul 2026
14replies
H

What should I ask suppliers for beyond a payload total? (Fairino FR5, planning a housing transfer operation)

HarishArcher0402 · 5 points · Buying advice · 13 Jul 2026
10replies