Finger channels under the carton support strips

JoBarnes0592 · 2025年11月15日 02:57 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

JO
JoBarnes0592
I've put the packed carton beside our FR5 pallet section and the rotated layer leaves one stiffened strip over a finger channel. Packaging wants the channel moved; tooling needs it to withdraw. Both drawings look tidy separately.

13 条回复

EL
EllaBarnes0555

Give both teams the same section with the actual strip and finger movement shown. Who owns resolving the clash?

17分
JO
JoBarnes0592

Our project engineer owns the layout. He has the two marked drawings but no combined revision yet. The count in the estimate still comes from the original pattern.

18分
SO
SofiaChen1152

I'd mark that count provisional now. My review had three drawings with different gaps before we put them together. It was surprisingly easy to think everybody had agreed the same arrangement.

23分
AN
AnikaCarter1030

Where is the packing operator in this review? A clever final gap can still be an awkward place to recover a damaged carton.

0分
EL
EllaBarnes0555

Anika, useful question, but Jo hasn't said the recovery task yet. The layout needs that task defined rather than an assumed hand reaching into the gap.

15分
AN
AnikaCarter1030

Fair. Jo, who handles a damaged carton and where is that done? That's what I should have asked.

-1分
HA
HarishBell0663

Is the carton in the section the packed construction you currently receive? Same outside size doesn't always mean the supports inside stayed put. We nearly carried an obsolete assumption through a changeover because the pallet picture was unchanged.

23分
JO
JoBarnes0592

Harish, yes, packaging checked our current packed sample. Anika, damaged cartons are removed upstream before pallet loading; the interruption procedure at the pallet still needs defining.

15分
SO
SofiaChen1152

Keep those as separate tasks in the review. Upstream rejection doesn't answer what happens if a carton is damaged during placement.

17分
JO
JoBarnes0592

Understood, Sofia. I've added that open question rather than describing the upstream check as recovery. The combined section now shows exactly where the channel crosses the strip.

23分
HA
HarishBell0663

Thanks for checking the construction. Has tooling offered a different withdrawal arrangement, or is packaging being asked to accept the same gap with a clearer drawing?

16分
JO
JoBarnes0592

Two alternatives proposed: changed withdrawal space, or a lower-count layer. Neither approved by packaging yet. The estimate now labels the original count provisional.

4分
EL
EllaBarnes0555

Please post which survives the joint review. Including what happens to the interruption task, not only the carton count.

11分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .