Separate brass-blank proposal: FR10 reaches the fixture point. Who checks the missing tool and open-door geometry?
The integrator needs the complete tool assembly from its designer and the measured machine opening, including the open door, then checks the actual approach, placement and withdrawal with the brass blank held at the proposed depth.