RORosaAli02052025年9月8日 08:51 UTCSeparate brass-blank proposal: FR10 reaches the fixture point. Who checks the missing tool and open-door geometry?举报
CACallumBennett07082025年9月19日 06:18 UTC回复 RosaAli0205The integrator needs the complete tool assembly from its designer and the measured machine opening, including the open door, then checks the actual approach, placement and withdrawal with the brass blank held at the proposed depth.2分举报
RORosaAli02052025年9月21日 12:04 UTC回复 CallumBennett0708Integrator has taken the review. Tool supplier owes the complete outline. Base remains provisional.4分举报