RORosaAli02058 Sept 2025, 08:51 UTCSeparate brass-blank proposal: FR10 reaches the fixture point. Who checks the missing tool and open-door geometry?Report
CACallumBennett070819 Sept 2025, 06:18 UTCReplying to RosaAli0205The integrator needs the complete tool assembly from its designer and the measured machine opening, including the open door, then checks the actual approach, placement and withdrawal with the brass blank held at the proposed depth.2pointsReport
RORosaAli020521 Sept 2025, 12:04 UTCReplying to CallumBennett0708Integrator has taken the review. Tool supplier owes the complete outline. Base remains provisional.4pointsReport