our tray handover teaches starting, then says ask Caleb

CalebBell0667 · 2025年11月10日 11:16 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

CA
CalebBell0667
I've handed over the UR5e block-sorting job, but every interrupted run still comes to me; the sheet explains normal loading and then names me where it should explain the uncertain case.

6 条回复

LO
LouisBell0659

What information can the operator pass to your cover when you are absent, and does the sheet identify that role rather than relying on your name?

12分
CA
CalebBell0667

It shows the tray and pocket, but no distinction between confirmed empty and unknown after interruption. Shift lead is my cover; that isn't written anywhere on the page.

13分
NI
NinaAli0240

Changing the contact will help, but the shift lead still needs an explanation of that distinction and the approved route for unresolved work. A new name beside the same vague instruction would leave the main question intact.

7分
CA
CalebBell0667

Controls is reviewing the two states with the shift lead. I've replaced the personal contact line with the role and added a worked unresolved example, marked as a draft pending that review.

18分
NI
NinaAli0240

Has someone who was not in the design conversation tried reading that example? Thank you for keeping it a draft; a clear-looking page can still ask the operator to infer something the screen does not tell them.

10分
LO
LouisBell0659

And did the shift lead find the identified held block from the example, or did the walkthrough stop at the screen?

21分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .