our tray handover teaches starting, then says ask Caleb

CalebBell0667 · 10 Nov 2025, 11:16 UTC

Closed
CA
CalebBell0667
I've handed over the UR5e block-sorting job, but every interrupted run still comes to me; the sheet explains normal loading and then names me where it should explain the uncertain case.

6 replies

LO
LouisBell0659
Replying to CalebBell0667

What information can the operator pass to your cover when you are absent, and does the sheet identify that role rather than relying on your name?

12 points
CA
CalebBell0667
Replying to LouisBell0659

It shows the tray and pocket, but no distinction between confirmed empty and unknown after interruption. Shift lead is my cover; that isn't written anywhere on the page.

13 points
NI
NinaAli0240
Replying to CalebBell0667

Changing the contact will help, but the shift lead still needs an explanation of that distinction and the approved route for unresolved work. A new name beside the same vague instruction would leave the main question intact.

7 points
CA
CalebBell0667
Replying to NinaAli0240

Controls is reviewing the two states with the shift lead. I've replaced the personal contact line with the role and added a worked unresolved example, marked as a draft pending that review.

18 points
NI
NinaAli0240
Replying to CalebBell0667

Has someone who was not in the design conversation tried reading that example? Thank you for keeping it a draft; a clear-looking page can still ask the operator to infer something the screen does not tell them.

10 points
LO
LouisBell0659
Replying to CalebBell0667

And did the shift lead find the identified held block from the example, or did the walkthrough stop at the screen?

21 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .