简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

our tray handover teaches starting, then says ask Caleb

CalebBell0667 · 2025年11月10日 11:16 UTC

已关闭
CA
CalebBell0667
I've handed over the UR5e block-sorting job, but every interrupted run still comes to me; the sheet explains normal loading and then names me where it should explain the uncertain case.

6 条回复

LO
LouisBell0659

What information can the operator pass to your cover when you are absent, and does the sheet identify that role rather than relying on your name?

12
CA
CalebBell0667

It shows the tray and pocket, but no distinction between confirmed empty and unknown after interruption. Shift lead is my cover; that isn't written anywhere on the page.

13
NI
NinaAli0240

Changing the contact will help, but the shift lead still needs an explanation of that distinction and the approved route for unresolved work. A new name beside the same vague instruction would leave the main question intact.

7
CA
CalebBell0667

Controls is reviewing the two states with the shift lead. I've replaced the personal contact line with the role and added a worked unresolved example, marked as a draft pending that review.

18
NI
NinaAli0240

Has someone who was not in the design conversation tried reading that example? Thank you for keeping it a draft; a clear-looking page can still ask the operator to infer something the screen does not tell them.

10
LO
LouisBell0659

And did the shift lead find the identified held block from the example, or did the walkthrough stop at the screen?

21

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .