The good bracket dimension was written after straightening

IsaacBaker0520 · 2025年5月9日 06:02 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

IS
IsaacBaker0520
I followed a correction note on our old bracket sheet and found the accepted dimension was measured after a separate straightening operation. We're reviewing FR10 welding tooling, and the proposal treats that value as the fixture's output. I need the new handover to explain who handles the work if it remains.

6 条回复

EM
EmmaBennett0724

Find any readings before straightening, for the same bracket variant. That accepted number cannot tell you what originally left the fixture.

4分
IS
IsaacBaker0520

Only pass/fail marks before correction, no actual dimensions. The old operator remembers checking the gap near the top, but the sheet doesn't identify the measuring setup.

14分
EM
EmmaBennett0724

Ask quality to define that setup for new measurements. Also check which drawing revision the old operator was working to before combining his recollection with the current part.

13分
SO
SofiaBell0630

I'm dealing with a similar missing correction bench in another proposal. Has your layout made room for that work, or quietly assumed the new fixture eliminates it? That assumption can leave the operator with nowhere to finish the part.

16分
IS
IsaacBaker0520

It assumed the work disappears. We've held that part of the layout while quality and welding plan the trial. Thanks, I'll get the operator involved before the revised bench arrangement is drawn.

0分
EM
EmmaBennett0724

Did you find the old drawing revision? That remains worth answering even if the new trial uses the current one.

16分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .