ready means two things in our FR5 handover meeting

NaomiBrown0941 · 2025年10月14日 20:54 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

NA
NaomiBrown0941
Our FR5 lathe-loading interface meeting ended with both suppliers agreeing ready, but one meant the sleeve request had arrived and the other meant the loading area was available; I need wording the maintainer can actually use.

10 条回复

NA
NadiaCarter0987

Can each supplier describe the physical or logical event behind their ready signal without using the word ready? That should expose which two meanings need separate names.

14分
AN
AnikaBaker0508

Use request received and loading area available as separate states, with owners and conditions.

11分
IM
ImranAdams0131

Our training interface had the same agreeable word covering different events. The normal sequence looked fine until we asked what happened when receipt was confirmed but the work could not start.

17分
CA
CalebAli0232

Imran, did they also distinguish completion from acknowledgement?

-8分
NA
NaomiBrown0941

Both suppliers now describe receipt separately from area availability, and we have added work complete as another event; they still disagree about who owns cancellation after a communication loss.

7分
IM
ImranAdams0131

Caleb, yes, receipt and completion needed separate definitions on ours. Naomi's cancellation question sounds like the next missing agreement, not something a rename can settle.

20分
NA
NadiaCarter0987

Naomi, what can each side establish about an accepted request after the connection returns? Cancellation depends on the state of the work, not merely on the connection having dropped.

6分
AN
AnikaBaker0508

Keep the ordinary job agreement separate from the independently assessed safety functions.

3分
CA
CalebAli0232

And do not turn an unknown outcome into permission to repeat loading.

12分
NA
NaomiBrown0941

We have asked both owners to list their retained request and result information for the recovery review; normal wording is agreed, cancellation and reconciliation remain unfinished, and the safety review stays separate.

11分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .