Which connection guide applies to our delivered UR5e package?

LiamAbbott0055 · 2026年3月15日 22:31 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LI
LiamAbbott0055
The external identities match our order, but the supplied guide shows a different arrangement around the arm connection cable. Fifty-four days since I asked the seller for the applicable documents. Setup is still unpowered. I want the installer to have a coherent package, not choose whichever picture looks closest.

19 条回复

LU
LuisBrown0956

Send the package identities, external overview and the specific conflicting guide page to the seller's technical contact. Ask for the applicable assembly drawing and connection procedure, with revisions, for your installer to compare.

15分
LI
LiamAbbott0055

Done. The technical contact says the picture belongs to an earlier package arrangement. They sent a newer assembly drawing but no connection procedure.

12分
BE
BenBrown0892

Does the newer drawing actually match what arrived, Liam, or have they only sent a newer date?

7分
LI
LiamAbbott0055

Installer says the external arrangement matches. The cable references still need their table. We have asked for that and the procedure. Nothing connected or powered.

13分
IM
ImranAllen0305

Good. Have the installer list all the referenced files they need at once. Otherwise the drawing can point to another document and you spend a week discovering that attachment is missing too.

15分
HA
HanaAllen0274

Keep the exact confusing page with the enquiry. We had a correction arrive that explained a different connector because someone replied from the wrong email branch.

20分
LU
LuisBrown0956

Hana's point is useful. The response should name the assembly it applies to, not rely on the subject line carrying the whole package identity.

-7分
LI
LiamAbbott0055

The installer supplied a short missing-file list. Seller returned the cable table and a procedure, but the procedure still references the old assembly number.

10分
BE
BenBrown0892

So still inconsistent. Did you send that specific cross-reference back?

8分
IM
ImranAllen0305

And ask whether that procedure is intentionally shared between arrangements or simply the wrong file. The number difference needs an explanation, not a guess from us.

19分
LI
LiamAbbott0055

Yes. Technical contact admits the wrong procedure was attached. They have named the replacement document but have not sent it yet.

5分
HA
HanaAllen0274

I'd rather that admission than another equivalent answer. Does your installer know the earlier procedure is withdrawn?

16分
LI
LiamAbbott0055

They do. Working folder has a clear hold note. The wrong guide remains only with the correspondence so it cannot be selected as an alternative.

20分
LU
LuisBrown0956

Have the installer compare the eventual complete set before releasing that hold. Correcting one attachment should not bypass the package review you started.

11分
BE
BenBrown0892

Has the named procedure arrived now?

5分
LI
LiamAbbott0055

Arrived. It names our assembly and the supplied cable references. Installer is checking the whole set against the delivered package, not just the one corrected page.

5分
IM
ImranAllen0305

Useful. When they finish, put the agreed revisions on the handover index so the next person does not have to replay these emails.

20分
LI
LiamAbbott0055

Installer completed the document and external-package comparison. Applicable set accepted and indexed. Setup checks are a separate booked task; we have not powered the package yet.

14分
HA
HanaAllen0274

A coherent set at last. That should make the setup visit considerably less of a document hunt.

13分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .