My FR10 inspection screenshots stop before the external recipe begins

AdaBell0651 · 23 Aug 2026, 13:20 UTC

Reply to discussion
AD
AdaBell0651
Our coupon-inspection handover is mostly FR10 pendant screenshots. No revisions, called routines, fixture assumptions or ordinary PLC conditions. How do I capture the real dependencies while the integrator is available?

1 reply

LU
LuisAbbott0086
Replying to AdaBell0651

Ask the integrator to walk one identified inspection job from recipe selection through result handling, with its actual backup and revisions open. Have them identify called programs, external recipe ownership, fixture assumptions and ordinary signal meanings, including a wait that does not complete normally. Keep the screenshots as illustrations linked to that record; they need not be discarded, but they cannot substitute for the dependencies they never showed.

17 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.