Reply to discussion Our fixture-loading sketch shows the polymer blank entering, but no gripper body or open door. What should I request?
15 replies Can the integrator combine the measured machine opening with the complete proposed tool and held blank through loading, release and empty withdrawal?
17 pointsThey will, once the machine owner supplies the open-door survey. Complete tool model is available.
20 pointsDoes the model include the grip depth, or is the blank parked wherever it makes the doorway look widest?
8 pointsGrip depth is specified. Door survey arrived; the original approach puts the rear fitting against the door.
13 pointsWhich alternatives are actually available in the bay? A side position is worth nothing if it occupies the machine's required service space.
21 pointsCan the setter mark their fixture-change route on that survey too? The robot route and the person's route need to coexist, not take turns being omitted.
10 pointsLin, a farther frontal stand is available. David, setter marked the change route. Side space is unavailable.
7 pointsAsk for the farther position with the same fitted assembly, grip and full exchange sequence, including the setter's marked route.
4 pointsFarther position clears the door in the completed model. Empty withdrawal and the receiving placement are also shown.
5 pointsHas anyone checked how the operator loads and removes the receiving tray at that position?
21 pointsHana's question is separate from my fixture-change route. Ada, both tasks need their real working space in the final layout.
10 pointsBoth checked with the operators. Farther stand preserves them, but needs a longer supply presentation area.
6 pointsIs that extra area available and priced, or still a note beside the drawing?
24 pointsAvailable and costed. We selected the farther position for the proposal with the revised presentation area included.
20 pointsGive the stand supplier that complete accepted layout revision, so its scope includes the checked access spaces rather than only the FR10 mounting point.