I compared two boxed-kit proposals and found training included in both, but one means teaching me to start the job and the other includes our relief operators. How should I compare them fairly?
First covers one nominated programmer and a normal run. Second names changeover, interrupted work and two operator groups. Neither says who updates the instructions after the pilot fixture changes.
Both suppliers have the same requested staff groups, operating cases and post-fixture instruction review now. Thanks, Ravi. The lower total is marked incomplete until that scope is answered.