During our polymer-block handover I kept saying resume, then a relief operator asked whether I meant the unfinished transfer or the next block; I had been answering from memory of the stop, while the sheet says the same thing for both, so I need to straighten out the decision before calling this handed over.
We had tray identity survive but nowhere to put an uncertain part in the instructions. Naming the right tray helped, but the lead still needed a defined hold and review route. Does yours have one?
Liam, the attempt and tray identities remain; Hassan, uncertain location already goes to the lead with the part held for review, but my sheet fails to distinguish that from a completed transfer awaiting the next request.
It has a completion state, but our printed screenshot cuts that line off; the relief operator was using the sheet exactly as written, which is uncomfortable to admit after telling everyone it was straightforward.
The revised walkthrough worked: the relief operator found both branches and referred the uncertain case to the lead without my hint, but a second interruption during that review still needs the author's answer before we finish.