How do I compare FR5 unloading while the tool connection is provisional?

PriyaBell0655 · 9 Nov 2025, 14:02 UTC

Closed
PR
PriyaBell0655
Our polymer-blank proposal has the familiar bare reach sketch. I've already requested the open-door survey, complete held tool and cable-replacement access, following the connection issue on our other review. Supplier is still choosing the fitting orientation. Can the integrator compare candidates before that choice is final?

2 replies

JA
JasperChan1073
Replying to PriyaBell0655

Yes, with each candidate assembly and its uncertainty shown explicitly. Compare the real held blank and connection space through unloading, not a single fitting-free outline that looks final.

13 points
PR
PriyaBell0655
Replying to JasperChan1073

Two candidate orientations now shown against the surveyed opening. One conflicts with the handle; the other still needs loaded withdrawal and service access assessed. Thanks Jasper. No stand released from that partial comparison.

17 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .