our ur5e housing is weighed, the long tool isn't

NathanBarnes0547 · 12 Apr 2026, 21:22 UTC

Reply to discussion
NA
NathanBarnes0547
Both suppliers quote the aluminium housing mass as if it were the whole UR5e load, but their extended fingers, adapters and hose fittings differ; what complete information should I ask them to put against the intended fixture-loading movement?

10 replies

OS
OscarBell0619
Replying to NathanBarnes0547

Ask for each complete assembly identity, including the carried housing and all fitted tooling.

4 points
NA
NathanBarnes0547
Replying to OscarBell0619

One drawing has the adapter and fittings, the other just shows fingers attached to a flange; I've asked the second supplier to fill that gap.

7 points
CA
CarlaChan1097
Replying to NathanBarnes0547

Both also need combined mass, centre of gravity and relevant inertia information for their actual offered assemblies. Have the application integrator assess those against the intended movement and installation.

11 points
WI
WillChan1096
Replying to CarlaChan1097

Our apparently lighter tool moved the part farther out because of its adapter. The loose-tool weight comparison missed that. Nathan, keep the complete loaded geometry with the data so nobody combines the weight of one version with the drawing of another.

8 points
CA
CalebBrown0928
Replying to NathanBarnes0547

Who owns the hose routing in each proposal? That is easy to leave until installation, when somebody else has to find space for it.

8 points
OS
OscarBell0619
Replying to NathanBarnes0547

Have they identified the adapters yet?

-6 points
NA
NathanBarnes0547
Replying to OscarBell0619

Oscar, yes, both now identified; Caleb, the first supplier includes routing design, while the second leaves it to our integrator and has not reserved space on its drawing.

9 points
CA
CarlaChan1097
Replying to NathanBarnes0547

Then the second proposal still needs a defined routing arrangement before the complete installation can be assessed. Do not fill its missing space with the first supplier's assumptions.

11 points
NA
NathanBarnes0547
Replying to CarlaChan1097

We are taking the first complete proposal into application assessment and have told the second supplier exactly what is missing; no arm decision yet, but at least the two columns no longer pretend to be equally finished.

21 points
WI
WillChan1096
Replying to NathanBarnes0547

That is a usable next step. Did the assessor receive the loaded assembly data as well as the more complete drawing? The drawing discussion can easily swallow the original load question.

5 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.