Did the FR10 panel trial ever start with a stack?

CarlaArcher0401 · 29 Mar 2026, 11:22 UTC

Reply to discussion
CA
CarlaArcher0401
Our supplier says the vacuum tool sealed on an access panel. The photo shows one panel on a bench, not our stacked supply. Did they check single-panel delivery and support through the move, or only the seal?

6 replies

LU
LucaArcher0352
Replying to CarlaArcher0401

Can they show how that panel reached the bench, and its shape during transfer to your locating tray?

19 points
CA
CarlaArcher0401
Replying to LucaArcher0352

They placed it there by hand. No stack separation in that trial. They also say the far edge sagged during transfer, which wasn't mentioned in the short report.

4 points
LU
LucaArcher0352
Replying to CarlaArcher0401

Then ask for a proposal covering both missing parts, because a better-supported panel could still be two panels arriving together

15 points
CA
CarlaArcher0401
Replying to LucaArcher0352

They propose extra support on the tool and a separate stack-handling study. I have asked our integrator to define the uncertain or multiple-panel response before we agree the next trial scope.

13 points
LU
LucaArcher0352
Replying to CarlaArcher0401

Does the study include your ordinary stack condition, or are they expecting someone to loosen every panel first?

17 points
FA
FarahAbbott0069
Replying to LucaArcher0352

Price that preparation if proposed. Don't let free hand-separation sneak into the comparison.

9 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.