I'm including the operator's sheet-replenishment work in our UR5e pallet proposal, but packaging now says the proposed sheet may not provide the support our turned component cases need over the gaps; what should I ask them and tooling to settle before we price a sheet dispenser?

2 replies

AI
AishaAdams0170
Replying to PatBowen

Ask them to assess the actual proposed sheet and packed case over the relevant gaps, with tooling's placement and withdrawal space shown. I mean the complete support arrangement, not just a material sample. There is little value pricing a dispenser until that arrangement has a reason to remain in the proposal.

13 points
PA
PatBowen
Replying to AishaAdams0170

Packaging rejected the proposed sheet for that support arrangement, so we've taken it and its dispenser out of the estimate; tooling is comparing a different layer with packaging now, and thanks for making the order of those decisions clear, Aisha

17 points