Ask which feature failed on release and which drawing revision those records used, then keep the restrained check separate from the final corrected measurement; the extra clamp needs a current design justification, not just an old accepted number.
Extra restraint proposed from post-correction measurements
ElenaBrooks0862 · 4 Aug 2025, 12:02 UTC
Our FR5 bracket proposal adds a clamp using old accepted dimensions. Those dimensions were measured after correction. I want the uncorrected inspection evidence located before anyone machines the extra restraint.
3 replies
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .