Our UR5e fixture review has a table of bracket angles, but the copied table dropped the column saying clamped or released. Some rows also follow correction. I'm asking for the source sheets before anyone averages this lot.
Then rebuild the table with those conditions visible. Leave missing conditions blank rather than copying the one from the row above because it looks likely.
Inspector matched most rows. The low angles are mainly clamped checks; the final accepted readings followed correction. Three rows still lack a clear stage.
Who is correcting the estimate if that proposal changes? We've had the technical note amended while the buyer's cost sheet carried on selling the original story quite happily.
Ella, it came from this table. Harish, our estimator has the correction and is revisiting the allowance, including Henry's press-time point. No new fixture decision yet.
Did the review produce a fresh sample plan? I'd be interested whether the proposed restraint survives once they're looking at released readings from identified pieces.