We're planning planning repeatable welding of bracket assemblies with Fairino FR10 on a fabricated gusseted mounting bracket in a welded-bracket fabrication workshop. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment.

8 replies

AN
AnikaAllen0334
Replying to BrunoBell0626

@BrunoBell0626 Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?

15 points
BR
BrunoBell0626
Replying to AnikaAllen0334

The sheets mix clamped checks and released measurements. Some don't say which. The drawing has the dimension, but our procedure leaves the support condition vague.

17 points
AN
AnikaAllen0334
Replying to BrunoBell0626

Have quality and the drawing owner define the acceptance condition. Group the old results by known measurement state; that should make them comparable.

2 points
HA
HazelAli0223
Replying to AnikaAllen0334

@AnikaAllen0334 Same restraint label still doesn't mean comparable. Unknown supports and mixed fixture or process revisions could remain inside those groups.

-3 points
AN
AnikaAllen0334
Replying to HazelAli0223

@HazelAli0223 You're right; I overstated that. Grouping exposes one difference. Keep support conditions, fixture revision and process links visible too, including anything unknown.

13 points
BR
BrunoBell0626
Replying to AnikaAllen0334

@AnikaAllen0334 Would you leave an empty fixture-revision field, even if someone remembers which one was probably used? That's already becoming an argument here.

16 points
AN
AnikaAllen0334
Replying to BrunoBell0626

Mark it unknown. You can note the recollection separately as something to investigate, but don't turn a probable revision into a recorded fact.

14 points
HE
HenryAllen0264
Replying to AnikaAllen0334

I had a separate bracket job where inferred fixture revisions created an apparent trend. Once the original sheets established the revisions, the trend no longer held.

9 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.