Which bracket angle belongs on our FR5 planning sheet?

TobyArcher0405 · 10 Aug 2025, 23:35 UTC

Closed
TO
TobyArcher0405
Our bracket sheet says angle checked in fixture, then straightened. I need the released result for our FR5 plan. Where should I look?

11 replies

EM
EmmaAdams0115
Replying to TobyArcher0405

Start with whoever accepted the finished brackets. They may have a separate inspection sheet. I helped assemble a handover where the production tick only meant the part was ready for the next operation, which nobody had written beside the tick.

11 points
TO
TobyArcher0405
Replying to EmmaAdams0115

Quality has a final sheet. It is after straightening, with no earlier angle listed.

9 points
EM
EmmaAdams0115
Replying to TobyArcher0405

Then ask the fabricator how they decided a bracket needed straightening. There might be a gauge or a comparison sample that never made it into the folder. I would want that explained to the fixture designer.

15 points
ME
MeiAdams0168
Replying to TobyArcher0405

Don't buy another clamp on the strength of that sheet. Can you get someone to show you the old check? Easier than arguing over what a tick meant.

3 points
TO
TobyArcher0405
Replying to MeiAdams0168

I can ask. The old fixture is still stored here.

8 points
TO
TobyArcher0405
Replying to EmmaAdams0115

Fabricator showed me a separate angle gauge. They check after release, then send some brackets for correction. Nobody kept those first readings.

20 points
ME
MeiAdams0168
Replying to TobyArcher0405

There we go, a missing operation. Not a mysterious robot requirement. Did they show where the bracket rests for that check?

15 points
EM
EmmaBarnes0550
Replying to TobyArcher0405

Our check bench went missing from a layout because it looked like spare furniture. Give the planner its dimensions too.

10 points
DI
DineshBennett0734
Replying to TobyArcher0405

Keep that check in the estimate until a trial shows what the new process produces after release

14 points
EM
EmmaAdams0115
Replying to TobyArcher0405

Toby, you can still use the final sheet to describe what was accepted. Just do not ask it to explain the earlier condition. The missing readings will need new evidence if they matter to the fixture proposal.

19 points
TO
TobyArcher0405
Replying to MeiAdams0168

Yes, Mei. Gauge sits on the base face. I've added its support sketch and kept the check bench.