What should we measure before choosing Fairino FR10? - machining fixture exchange

AnilArcher0375 · 30 May 2026, 00:09 UTC

Reply to discussion
AN
AnilArcher0375
Our proposed use for Fairino FR10 is machining fixture exchange with a rectangular polymer blank in an enclosed machining cell, with 41 planned. The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door. I need a fuller access check to inform our choice of arm.

19 replies

LI
LiamAdams0142
Replying to AnilArcher0375

Got measured outlines for the opening and gripper? An offline layout might catch what the reach circle misses.

24 points
AN
AnilArcher0375
Replying to LiamAdams0142

@LiamAdams0142 After comparing the outlines, I found that the proposed approach overlaps the door handle even though the workpiece itself clears. That explains the misleadingly comfortable result in my initial sketch.

17 points
LI
LiamAdams0142
Replying to AnilArcher0375

@AnilArcher0375 Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.

7 points
AN
AnilArcher0375
Replying to LiamAdams0142

The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved.

20 points
LI
LiamAdams0142
Replying to AnilArcher0375

A larger arm should give you more mounting freedom, so that could be the easiest route to investigate.

25 points
OM
OmarAllen0317
Replying to LiamAdams0142

@LiamAdams0142 Bigger could bring another obstruction. Extra reach won't shrink the gripper past that handle.

-3 points
LI
LiamAdams0142
Replying to OmarAllen0317

@OmarAllen0317 Yes, I made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves.

22 points
ZA
ZaraBarnes0569
Replying to LiamAdams0142

@LiamAdams0142 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.

11 points
AN
AnilArcher0375
Replying to ZaraBarnes0569

Your example prompted me to compare our proposed pedestal with the service panel opening. That revealed another overlap to correct in the layout.

8 points
IS
IsabelAbbott0039
Replying to AnilArcher0375

Would making the pedestal removable address service access, or would restoring its position introduce a further setup requirement to evaluate?

18 points
LI
LiamAdams0142
Replying to IsabelAbbott0039

Restoring location and checking the installation would become part of that proposal. Ask the integrator to compare it with a layout that preserves routine service access.

13 points
AN
AnilArcher0375
Replying to LiamAdams0142

Our fixture needs straight entry. Put that constraint in before moving the base around?

15 points
LI
LiamAdams0142
Replying to AnilArcher0375

@AnilArcher0375 Yes. Include the required entry direction and withdrawal conditions, not just an end pose. A reachable point can still have no usable approach with the proposed tool.

17 points
ZA
ZaraBarnes0569
Replying to LiamAdams0142

Our unloading retreat differed from loading because the held workpiece changed the envelope. Modelling the empty gripper alone gave us a very flattering answer.

4 points
AN
AnilArcher0375
Replying to ZaraBarnes0569

I'll add both loaded and empty tooling to the model. The other unclear part of our quote is responsibility for the machine signals.

15 points
OM
OmarAllen0317
Replying to AnilArcher0375

@AnilArcher0375 Name whoever owns the interface work. Otherwise the robot and machine contacts can both think the other has covered fixture state and permission to enter.

15 points
IS
IsabelAbbott0039
Replying to OmarAllen0317

@OmarAllen0317 I'm having trouble distinguishing process readiness from safe entry because the sales description makes them sound equivalent. Does the machine-ready signal establish both?

22 points
LI
LiamAdams0142
Replying to IsabelAbbott0039

A process-ready signal isn't automatically a safety function. The qualified cell assessor needs to define protective measures and restart requirements separately from the production sequence.

20 points
AN
AnilArcher0375
Replying to LiamAdams0142

Would a supervised trial with a representative fixture let us make useful progress on geometry while the machine interface responsibilities are still being defined?

20 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.