I can't cost the new bracket route from final inspection alone, because the old batch cards send pieces through straightening before those measurements and the FR5 proposal has quietly lost that operation
Ask how many pieces needed that operation. Even a rough historical split would show whether your estimate is missing occasional rework or a routine production step.
We once removed a checking bench from a layout because its operation had no time against it. The person using it said nobody had ever asked them for a time, which was a rather different explanation from no work happening. Dinesh, I'd keep a provisional allowance for both the person and the space until somebody can describe your station, especially if the new layout is already squeezing everything together.
Oscar, yes, found a batch allowance under finishing; Harish, former operator says every bracket was checked there but only some were corrected, with no count recorded
Is there still room for the checking station in the proposed layout, Dinesh? I'd hate for the trial to bring the operation back only after its space has gone.