We're considering Fairino FR10 for finished blank removal with a machined brass blank in a production cell beside an enclosed mill, with 42 planned. The sketch reaches the fixture. Trouble is, we left out the gripper body and open door. I'd like to check access properly before choosing an arm.

20 replies

LU
LucyBell0654
Replying to AdaCarter0999

Got measured outlines for the opening and gripper? An offline layout might catch what the reach circle misses.

20 points
AD
AdaCarter0999
Replying to LucyBell0654

Checked them. The approach clips the handle; the workpiece clears. No wonder my first sketch looked so reassuring.

18 points
LU
LucyBell0654
Replying to AdaCarter0999

@AdaCarter0999 Start from those measurements and review approach and withdrawal offline with the full tool, cables and maintenance access included. A revised mount then needs the integrator's assessment.

14 points
AD
AdaCarter0999
Replying to LucyBell0654

The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved.

7 points
LU
LucyBell0654
Replying to AdaCarter0999

Going larger should open up mounting options. It might be the most straightforward option to explore.

21 points
PR
PriyaBaker0481
Replying to LucyBell0654

@LucyBell0654 Bigger could bring another obstruction. Extra reach won't shrink the gripper past that handle.

2 points
LU
LucyBell0654
Replying to PriyaBaker0481

You're right; more mounting freedom isn't guaranteed. Check each candidate in the measured layout and only favour a larger arm if its full approach works better.

17 points
CA
CallumBrown0882
Replying to LucyBell0654

@LucyBell0654 On our separate machine job, the first pedestal position blocked a maintenance panel. The transfer looked excellent until the maintenance person asked how they'd open it.

-2 points
AD
AdaCarter0999
Replying to CallumBrown0882

@CallumBrown0882 Checked ours. The suggested pedestal overlaps a panel opening too. More red pen for the drawing.

6 points
FI
FionaAli0238
Replying to AdaCarter0999

Could you move the pedestal for service? Or is putting it back a whole other job?

10 points
LU
LucyBell0654
Replying to FionaAli0238

A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout.

22 points
AD
AdaCarter0999
Replying to LucyBell0654

The fixture requires a straight approach segment. Should we establish that constraint in the model before exploring alternative positions for the robot base?

17 points
LU
LucyBell0654
Replying to AdaCarter0999

Yes, model the entry direction and retreat requirements as constraints. Reaching the final point doesn't establish that the full tool can approach it usefully.

9 points
CA
CallumBrown0882
Replying to LucyBell0654

For our machine, withdrawal with a held workpiece needed a different route from entry. The empty-tool model made the clearance look much better than it was.

3 points
AD
AdaCarter0999
Replying to CallumBrown0882

@CallumBrown0882 I'll add both loaded and empty tooling to the model. The other unclear part of our quote is responsibility for the machine signals.

19 points
PR
PriyaBaker0481
Replying to AdaCarter0999

@AdaCarter0999 Get the interface responsibility explicit. A robot supplier and machine contact can each assume the other has handled access permission and fixture state.

3 points
FI
FionaAli0238
Replying to PriyaBaker0481

Machine ready means safe to enter, doesn't it? The sales wording makes them sound alike.

1 points
LU
LucyBell0654
Replying to FionaAli0238

Not necessarily. Process readiness doesn't by itself establish safe access. Have the qualified assessor define the cell's protective measures and restart conditions alongside the process interface.

25 points
AD
AdaCarter0999
Replying to LucyBell0654

Measured access review first, then an arm decision. I've settled on that route; choosing the arm depends on a workable full-tool layout and qualified assessment.

22 points
LU
LucyBell0654
Replying to AdaCarter0999

Using an assessed layout as the condition gives the selection a clear basis beyond the reach sketch.

21 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.