Which UR5e inspection does this high completion belong to?

DanielBell0652 · 15 Oct 2025, 20:03 UTC

Closed
DA
DanielBell0652
Our commissioning monitor adds a coupon after reconnect without another inspection. Completion stayed high through the outage. I want the retained job identified before anyone clears the bit to tidy the display.

4 replies

CA
CalebBennett0754
Replying to DanielBell0652

Does the retained state include an attempt identifier you can compare with the saved result?

24 points
DA
DanielBell0652
Replying to CalebBennett0754

PLC retains a result reference. Monitor only logged the bit. Controls is checking which completed attempt that reference describes; no repeat request sent.

5 points
CA
CalebBennett0754
Replying to DanielBell0652

Did that reference match an existing result, or is it still unresolved?

24 points
IM
ImranChan1088
Replying to DanielBell0652

Our operator once treated an unresolved row as a new inspection to run, so give this one a clear review owner while controls traces it; an uncertain result is not an empty work slot.

2 points