I cannot hand over our UR5e housing inspection from pendant pictures alone

VictorBennett0707 · 24 Aug 2026, 01:56 UTC

Reply to discussion
VI
VictorBennett0707
Our inspection-cycle notes show the UR5e main routine but leave the called programs, fixture assumptions and ordinary PLC conditions in the integrator's head. There are no revisions on the screenshots either. I need the dependencies recorded while that person is available, so maintenance isn't left choosing between pictures and whatever the cell happens to be running.

3 replies

VI
VictorAbbott0011
Replying to VictorBennett0707

Walk one identified job through the installed backup, including a normal result and an ordinary wait.

17 points
VI
VictorBennett0707
Replying to VictorAbbott0011

We did that with our maintainer following the integrator. The wait depends on a fixture condition documented on a separate sheet nobody had included in the pack; its revision is now linked to the backup and called-routine list. The recovery responsibility still needs an agreed entry.

19 points
VI
VictorAbbott0011
Replying to VictorBennett0707

Keep that recovery entry explicitly unfinished. A linked dependency is not yet an authorised response to its absence.

12 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.