I'm preparing our sample verification handover for Fairino FR5 in a maintenance review of a commissioned inspection cell, using a sample housing.
The notes are mostly pendant screenshots without revision details.
They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals.
I need a usable structure while the original integrator is still available.
Start by identifying the installed program revision and its corresponding controlled export. Can you establish that link before describing the routine's dependencies?
Our installed revision matches a controlled export, but I've identified screenshots from an older program copy. Their different routine names explain the mismatch in our notes.
@AlexBrooks0820 You're right to limit my wording. The map supports understanding the program; recovery instructions must come from the responsible integrator's approved procedure, not from inferred call order.
Retain the images as labelled historical material, with their established revision references, so they explain the discrepancy without appearing to describe the installed program.
@LeoChen1145 Our revision trail is clearer, including which screenshots are historical. I still haven't completed the dependencies and recovery references needed for the handover.