I've asked for the missing open door and full gripper in our steel-blank unloading layout. Can we use the current sketch to eliminate bad positions, or is even that premature?
Fair enough. Setter has already ruled out the position blocking their fixture trolley; the other one stays provisional until the complete route is checked.