We're considering Fairino FR10 for machine fixture loading with a short steel blank in a production cell beside an enclosed mill, with 91 planned. The sketch reaches the fixture.
Trouble is, we left out the gripper body and open door. I'd like to check access properly before choosing an arm.
@DanielArcher0391 Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.
A different arm geometry may introduce its own clearance problems. Increasing reach doesn't establish that the proposed tool can pass the existing handle obstruction.
You're right; more mounting freedom isn't guaranteed. Check each candidate in the measured layout and only favour a larger arm if its full approach works better.
@VictorAllen0272 On our separate machine job, the first pedestal position blocked a maintenance panel. The transfer looked excellent until the maintenance person asked how they'd open it.
Measured access review first, then an arm decision. I've settled on that route; choosing the arm depends on a workable full-tool layout and qualified assessment.