Start with an identified export of the installed job and its dependencies, then link the screenshots to that revision and the actual fixture and interface references (the pictures can illustrate the handover, not define it).
Which UR5e revision should our bracket handover screenshots describe?
FelixChan1067 · 21 Mar 2026, 20:52 UTC
The integrator's handover pictures show a main routine, but no revision or link to the subprogram that coordinates our bracket inspection. I want a maintainer to find the installed job, fixture assumptions and ordinary PLC exchange without guessing which screenshot is newest. The integrator is still available to help.
4 replies
Add to the discussion
Welcome to Application Robot
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.