I am comparing two recordings of our FR5 sleeve transfer. The placement is skewed in the newer one, after several pickup-point adjustments. The tray corners appear to line up with the bench marks. What should I ask maintenance to inspect before we change another point?
The first clear view is halfway through transfer, and it is already tilted there. The fixture hides the actual pickup. I cannot tell from these recordings whether it was gripped that way or moved afterwards.
I've added that to the inspection request. We can review the tool contact surfaces while isolated, then have the responsible technician arrange an observation of pickup under the cell's normal commissioning procedure. The current video alone cannot settle it.
I need to define that with maintenance. My earlier description mixed the sleeve's angle in the image with its position relative to the fingers. I'd ask for a view that shows both the sleeve and an identifiable tool feature. I don't have that observation yet.
Worth asking which feature represents the locating geometry, not just whichever edge is easiest to see. Then the pictures and the mechanical inspection can discuss the same relationship