We're planning defining dimensional control for bracket welding with Fairino FR10 on a steel gusseted bracket assembly in a robotic welding project review. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment.

13 replies

AN
AnnaAllen0329
Replying to SofiaBrown0891

Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.

9 points
SO
SofiaBrown0891
Replying to AnnaAllen0329

My sheets contain both restrained and released results, with some conditions unlabelled. Although the drawing specifies the dimension, the inspection procedure doesn't clearly define the supports.

20 points
AN
AnnaAllen0329
Replying to SofiaBrown0891

@SofiaBrown0891 Ask quality and the design owner to establish the intended acceptance condition, then group historical results by their documented measurement state to support comparison.

20 points
OL
OliverAdams0102
Replying to AnnaAllen0329

@AnnaAllen0329 Same restraint label still doesn't mean comparable. Unknown supports and mixed fixture or process revisions could remain inside those groups.

10 points
AN
AnnaAllen0329
Replying to OliverAdams0102

That's a fair correction. State grouping addresses only one source of difference; the review also needs support conditions and fixture and process references, with missing information explicitly identified.

6 points
SO
SofiaBrown0891
Replying to AnnaAllen0329

Should a fixture revision remain unknown when a colleague remembers a likely version but no record confirms it? We're disagreeing about whether to fill those gaps.

7 points
AN
AnnaAllen0329
Replying to SofiaBrown0891

Mark it unknown. You can note the recollection separately as something to investigate, but don't turn a probable revision into a recorded fact.

21 points
AN
AnnaBennett0764
Replying to AnnaAllen0329

I had a separate bracket job where inferred fixture revisions created an apparent trend. Once the original sheets established the revisions, the trend no longer held.

19 points
RE
RebeccaBell0691
Replying to AnnaBennett0764

@AnnaBennett0764 If the fixture holds it straight, why isn't that already the result we want?

7 points
AN
AnnaAllen0329
Replying to RebeccaBell0691

Because the required inspection condition may be after release. Holding a shape under restraint doesn't establish the shape the assembly takes without that restraint.

15 points
SO
SofiaBrown0891
Replying to AnnaAllen0329

I've had the drawing owner confirm the released inspection condition and its reference supports. Quality is adding those requirements to the sheet so the measurement state is explicit.

12 points
SO
SofiaBrown0891
Replying to SofiaBrown0891

My review approach is settled: establish the acceptance condition and use measurements with identifiable conditions. I can take that forward while leaving fixture and process changes dependent on specialist assessment.

6 points
AN
AnnaAllen0329
Replying to SofiaBrown0891

That gives the specialists an interpretable basis for review. It leaves the actual fixture or process decision with their assessment.

13 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.