An old setter showed me where our gusseted brackets went for correction after welding. Our FR10 proposal leaves that station out, but I cannot match the loose-part failures to the checks taken in the fixture. What should I ask quality to trace before planning assumes that work disappears?
Ask them to follow one identifiable bracket through the stages and confirm which drawing requirement each check used. I would also tell planning the correction labour is still unknown. A missing link in the old paperwork is not spare floor space