An old setter showed me where our gusseted brackets went for correction after welding. Our FR10 proposal leaves that station out, but I cannot match the loose-part failures to the checks taken in the fixture. What should I ask quality to trace before planning assumes that work disappears?
A loose-bracket failure with no matching clamped reading
NinaCarter1023 · 8 Aug 2025, 01:18 UTC
1 reply
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .