Adapter mismatch before the tool is even fitted
LeoCarter0971 · 23 May 2025, 14:49 UTC
17 replies
Identify the arm and supplied adapter separately, then put the actual adapter beside the agreed drawing revision in your request. The package sticker might not describe an arm change. Start with the feature that prevents your tooling from matching.
23pointsArm identifier matches. Adapter item label doesn't. The suffix is only on the seller's sticker. I've corrected the request so it focuses on the supplied adapter.
5pointsThat should be easier for them to answer. Have they sent a drawing for the delivered adapter?
11pointsNo drawing. Just a photo with 'same function' written underneath. We already have a fairly good view of the thing sitting here.
6pointsWhich locating feature differs? A measured comparison against the approved drawing would let you ask about the actual interface rather than the photograph's appearance.
1pointsThe shoulder that locates our tool plate. Toolroom is checking its dimensions against the drawing. We haven't modified or fitted either part.
20pointsGood. Don't make it fit while they're still answering.
4pointsWho owns the decision if they offer another adapter? I'd have the tooling designer involved before purchasing accepts a substitute and hands you a new drawing to make work.
14pointsOur stores descriptions once made two different inserts look interchangeable on the pick list; I'd ask them to confirm the actual adapter identifier in any replacement offer, not just 'correct part'.
0pointsTooling designer reviews it with purchasing. Stores has the disputed item tagged separately. No more generic adapter description in the case notes.
20pointsToolroom confirmed the shoulder differs from the approved drawing. Seller now offers to send the agreed adapter. We have asked them to identify it before dispatch.
12pointsDid the comparison include the resulting tool position, or only whether it bolts together? Both matter if anyone is still proposing to use the supplied adapter.
4pointsBoth checked. Tooling rejected using the supplied item with our setup. We're pursuing the agreed replacement, not adapting this one.
7pointsUnderstood. That answers my concern.
12pointsAny actual replacement dispatch yet?
24pointsNot yet. We have the proposed replacement identifier and tooling is checking the supplied drawing. The bench stays waiting until the right item arrives and is checked.
9pointsLeave that last receiving check assigned to someone. After a long email exchange, a parcel arriving can feel like the finish even when its contents still need matching to the agreement.
22pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .