ur5e bracket plan inherits a correction nobody has explained

JonasBaker0459 · 22 Jun 2026, 15:19 UTC

Reply to discussion
JO
JonasBaker0459
Historical support-bracket records show restrained alignment, released dimensional failure and later correction. I need distinct fit-up, location and acceptance evidence before our UR5e fixture plan inherits that routine.

18 replies

AN
AnnaAllen0329
Replying to JonasBaker0459

What does aligned mean in the original note? I would start with its actual wording and method. If it was a tick against fixture stops, it may never have claimed a drawing-compliant released assembly, however confidently the summary now tells that story.

17 points
JO
JonasBaker0459
Replying to AnnaAllen0329

Aligned to stops is the wording. No measured value. Released inspection has a dimension and a drawing reference.

16 points
AN
AnnaChan1112
Replying to JonasBaker0459

Is the released support arrangement recorded, Jonas? The drawing reference helps, but not if we don't know how the assembly sat while they measured it.

12 points
PR
PriyaBrown0916
Replying to JonasBaker0459

I've inherited files where the final good reading was much easier to find than the work that produced it. I would preserve the correction's place in the sequence now, even while its method and frequency are unclear. Otherwise the new estimate can quietly credit the proposed fixture with a result the old process achieved only after more work.

18 points
FA
FarahAli0243
Replying to PriyaBrown0916

Was correction applied to every assembly or only selected ones? I would not give the planner a per-piece time until that distinction is established. A batch total may include repeat work on the same bracket.

21 points
JO
JonasBaker0459
Replying to JonasBaker0459

Anna Chan, support condition absent. Farah, the correction entry is a batch note with no individual identities. Frequency cannot be calculated from it.

9 points
AN
AnnaAllen0329
Replying to JonasBaker0459

Then there are two separate limits. You cannot compare the restrained tick numerically with the released dimension, and you cannot turn the batch correction note into a reliable per-piece rate. Neither limit means the released failure or correction work should be removed from the record.

13 points
AN
AnnaChan1112
Replying to AnnaAllen0329

Anna Allen, yes. We can retain a failed released check without claiming we've measured how far the part moved after unclamping.

9 points
FA
FarahAli0243
Replying to JonasBaker0459

Who will define the current study, Jonas? I need to know whether fabrication and quality are both involved, not only the person pricing a replacement fixture from the old file.

12 points
PR
PriyaBrown0916
Replying to FarahAli0243

Farah's question matters to the sample selection too. I would include ordinary current assemblies, not just the memorable bad ones people kept. The study should answer a defined process question; a box of troublesome examples is useful evidence but not automatically a representative production rate.

12 points
JO
JonasBaker0459
Replying to FarahAli0243

Fabrication and quality will define it together. No trial approved yet. The estimator has the correction entry marked as recorded but unquantified work.

19 points
AN
AnnaChan1112
Replying to JonasBaker0459

Can the former inspector describe the missing support condition? A method description could help the study even if it cannot recover the old reading conditions with certainty.

10 points
JO
JonasBaker0459
Replying to AnnaChan1112

We have asked. The former inspector recalls supporting the free end, but cannot identify the support height or an approved method reference.

16 points
AN
AnnaAllen0329
Replying to JonasBaker0459

That is a useful account with a clear limit. It should not be converted into an exact support drawing and attached to the old dimensions as if measured at the time. Quality can use the account when deciding which current conditions need a defined method.

6 points
PR
PriyaBrown0916
Replying to JonasBaker0459

Did that recollection change the study question, Jonas, or only add another uncertainty to the historical account?

18 points
FA
FarahAli0243
Replying to JonasBaker0459

And has the estimator separated active correction time from elapsed waiting? They can both affect the proposal, but they are not interchangeable labour costs, even if better records eventually establish the frequency.

6 points
JO
JonasBaker0459
Replying to JonasBaker0459

Priya, it prompted an explicit support-method question in the draft study. Farah, elapsed waiting is now separate from active work, with both estimates still provisional. No historical dimensions have been recalculated.

12 points
AN
AnnaAllen0329
Replying to JonasBaker0459

That leaves the record in a defensible state for the next decision. Incoming fit-up, fixture location and released acceptance still need their own agreed checks in the current study; the improved index does not itself establish which fixture change will work.

17 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.