I cannot price this refurbished FR10 without knowing what the repair covered

PavelAli0179 · 12 Feb 2026, 03:15 UTC

Closed
PA
PavelAli0179
The seller has provided the actual FR10, controller and pendant identities for our block-unloading proposal. That clears one question. The inspection sheet still says only cleaned, checked and demonstrated. I need to decide whether a paid independent inspection is worth arranging before collection.

16 replies

BR
BrunoAbbott0017
Replying to PavelAli0179

What work or faults do they say prompted the refurbishment?

17 points
PA
PavelAli0179
Replying to BrunoAbbott0017

They say it came from a discontinued production job. Replaced external cable and cosmetic cleaning are listed. No reason for the cable replacement or detailed test findings yet.

4 points
AN
AnnaCarter1025
Replying to PavelAli0179

Ask for the replaced cable's identity and the reason it was replaced, alongside the actual checks afterwards. I would not infer a serious fault from replacement alone, but it should be part of the inspection scope.

25 points
RO
Rowan_Bailey
Replying to PavelAli0179

Get the independent inspector to price a defined review of that supplied combination and the available history. Collection is a later decision. I cannot tell from the listing whether it is a good buy, but you can price the next information-gathering step without committing to transport.

6 points
KI
Kim_Bailey
Replying to Rowan_Bailey

Does the seller allow the inspector to see the equipment before any collection payment is due? Worth resolving that practical detail before paying someone to travel.

19 points
AD
AdamBailey
Replying to PavelAli0179

Support availability belongs in your budget as well. A cheaper arm can still be a difficult teaching or production resource if nobody nearby will assess it when it stops.

22 points
CA
CallumBell0621
Replying to AdamBailey

Adam, yes, though support cost should be compared with the other candidates too. New does not automatically mean somebody appears promptly at your workshop.

13 points
AN
AnilBrown0897
Replying to PavelAli0179

Has the seller supplied an actual post-repair report, Pavel, or only the work list? Those are different documents.

8 points
YA
YasminAdams0093
Replying to Rowan_Bailey

I would keep your block-handling requirements with the inspector's brief, while recognising that an equipment inspection will not design or validate the future cell.

10 points
AN
Anders_Bowen
Replying to Rowan_Bailey

Interested whether the inspection quote still leaves this cheaper than your alternatives, Pavel.

7 points
PA
PavelAli0179
Replying to AnilBrown0897

Kim: inspection access agreed. Anil: detailed post-repair report arrived and identifies a damaged external cable, replacement and checks performed. Independent inspector has reviewed it and quoted the remaining examination. Support and transport are priced separately.

13 points
KI
Kim_Bailey
Replying to PavelAli0179

That gives you a more sensible comparison. Have you decided to pay for the examination, or does the total already put it out of contention?

0 points
PA
PavelAli0179
Replying to Kim_Bailey

We commissioned it. Inspector found a worn external connector retaining feature that the seller's report had not covered. Seller agreed to replace the affected assembly and have that work rechecked before sale.

12 points
BR
BrunoAbbott0017
Replying to PavelAli0179

Has the recheck happened, or is the improved offer still a promise?

11 points
PA
PavelAli0179
Replying to BrunoAbbott0017

Recheck completed and documented against the same package identities. We have chosen the unit at the agreed revised total, including the inspection cost. Collection is booked; integration of our unloading job remains separate work.

7 points
AD
AdamBailey
Replying to PavelAli0179

Thank you for posting the cost decision as well as the fault. It is useful to see an inspection lead to a specific repair and a purchase, rather than only a yes-or-no verdict on an advert.

18 points