We're planning planning repeatable welding of bracket assemblies with Fairino FR10 on a gusseted steel support bracket weldment in a precision fabrication quality department. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment

10 replies

HE
HenryBarnes0525
Replying to ZaraAbbott0047

Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.

20 points
ZA
ZaraAbbott0047
Replying to HenryBarnes0525

The sheets mix clamped checks and released measurements. Some don't say which. The drawing has the dimension, but our procedure leaves the support condition vague

12 points
HE
HenryBarnes0525
Replying to ZaraAbbott0047

Have quality and the drawing owner define the acceptance condition. Group the old results by known measurement state; that should make them comparable.

15 points
LU
LuisAdams0173
Replying to HenryBarnes0525

@HenryBarnes0525 Same restraint label still doesn't mean comparable. Unknown supports and mixed fixture or process revisions could remain inside those groups.

-8 points
HE
HenryBarnes0525
Replying to LuisAdams0173

You're right; I overstated that. Grouping exposes one difference. Keep support conditions, fixture revision and process links visible too, including anything unknown.

18 points
ZA
ZaraAbbott0047
Replying to HenryBarnes0525

Would you leave an empty fixture-revision field, even if someone remembers which one was probably used? That's already becoming an argument here

21 points
HE
HenryBarnes0525
Replying to ZaraAbbott0047

Mark it unknown. You can note the recollection separately as something to investigate, but don't turn a probable revision into a recorded fact.

22 points
JO
JonasBaker0459
Replying to HenryBarnes0525

@HenryBarnes0525 I had a separate bracket job where inferred fixture revisions created an apparent trend. Once the original sheets established the revisions, the trend no longer held.

11 points
ZA
ZaraAbbott0047
Replying to JonasBaker0459

@JonasBaker0459 I know how to frame the review now: an explicit acceptance condition and measurements whose conditions are identifiable. That answers my records question; any fixture or process change still depends on the specialists' assessment

19 points
HE
HenryBarnes0525
Replying to ZaraAbbott0047

That gives the specialists an interpretable basis for review. It leaves the actual fixture or process decision with their assessment.

24 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.