Our proposed use for Fairino FR10 is machining fixture exchange with a short steel blank in a production cell beside an enclosed mill, with 23 planned. The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door. I need a fuller access check to inform our choice of arm.

21 replies

FE
FelixAdams0110
Replying to IsabelAli0213

@IsabelAli0213 Can you compare measured door geometry with the proposed gripper envelope? An offline layout including both may expose access issues that the reach sketch doesn't represent.

5 points
IS
IsabelAli0213
Replying to FelixAdams0110

@FelixAdams0110 After comparing the outlines, I found that the proposed approach overlaps the door handle even though the workpiece itself clears. That explains the misleadingly comfortable result in my initial sketch.

12 points
FE
FelixAdams0110
Replying to IsabelAli0213

@IsabelAli0213 Start from those measurements and review approach and withdrawal offline with the full tool, cables and maintenance access included. A revised mount then needs the integrator's assessment.

21 points
IS
IsabelAli0213
Replying to FelixAdams0110

The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved.

14 points
FE
FelixAdams0110
Replying to IsabelAli0213

@IsabelAli0213 Going larger should open up mounting options. It might be the most straightforward option to explore.

10 points
CH
ChloeBaker0483
Replying to FelixAdams0110

@FelixAdams0110 Bigger could bring another obstruction. Extra reach won't shrink the gripper past that handle.

1 points
FE
FelixAdams0110
Replying to ChloeBaker0483

You're right; more mounting freedom isn't guaranteed. Check each candidate in the measured layout and only favour a larger arm if its full approach works better.

9 points
AL
AlexAllen0298
Replying to FelixAdams0110

@FelixAdams0110 On our separate machine job, the first pedestal position blocked a maintenance panel. The transfer looked excellent until the maintenance person asked how they'd open it

10 points
IS
IsabelAli0213
Replying to AlexAllen0298

Your example prompted me to compare our proposed pedestal with the service panel opening. That revealed another overlap to correct in the layout.

8 points
AL
AlexAli0211
Replying to IsabelAli0213

@IsabelAli0213 Could you move the pedestal for service? Or is putting it back a whole other job?

14 points
FE
FelixAdams0110
Replying to AlexAli0211

A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout.

10 points
IS
IsabelAli0213
Replying to FelixAdams0110

Our fixture needs straight entry. Put that constraint in before moving the base around?

19 points
FE
FelixAdams0110
Replying to IsabelAli0213

Yes, model the entry direction and retreat requirements as constraints. Reaching the final point doesn't establish that the full tool can approach it usefully.

3 points
AL
AlexAllen0298
Replying to FelixAdams0110

@FelixAdams0110 For our machine, withdrawal with a held workpiece needed a different route from entry. The empty-tool model made the clearance look much better than it was

1 points
IS
IsabelAli0213
Replying to AlexAllen0298

@AlexAllen0298 I'll include empty and loaded tool outlines. We also need to agree who owns the machine signals; that part of the quote is vague.

11 points
CH
ChloeBaker0483
Replying to IsabelAli0213

Get the interface responsibility explicit. A robot supplier and machine contact can each assume the other has handled access permission and fixture state.

15 points
AL
AlexAli0211
Replying to ChloeBaker0483

@ChloeBaker0483 Machine ready means safe to enter, doesn't it? The sales wording makes them sound alike.

1 points
FE
FelixAdams0110
Replying to AlexAli0211

@AlexAli0211 Not necessarily. Process readiness doesn't by itself establish safe access. Have the qualified assessor define the cell's protective measures and restart conditions alongside the process interface.

8 points
IS
IsabelAli0213
Replying to FelixAdams0110

@FelixAdams0110 Would a supervised trial with a representative fixture let us make useful progress on geometry while the machine interface responsibilities are still being defined?

7 points
FE
FelixAdams0110
Replying to IsabelAli0213

It can, with an appropriate supervised procedure. Record the actual tool and mount, and make clear that the trial addresses geometry while interface work remains open.

13 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.