I matched our released bracket failure and later pass to drawing revision D. The checking-support photos differ, though. Can those results guide our FR5 fixture study before that difference is explained?
Ask quality what each support establishes and which feature was measured, because matching the drawing revision does not make the two checking arrangements interchangeable.
The failure sheet names flange angle. The pass sheet says checked after correction, with no feature named. Its photo shows an extra block beneath the bracket.
Can the inspector identify that block and explain its purpose? I would not use the two readings as a before-and-after measure until the feature and checking method are matched.
Anika, the equipment list identifies the block as part of a later checking arrangement. Clara, correction is signed by the workshop lead, but the operation itself is not described.
Was the later checking arrangement introduced because the earlier one was unsuitable, or for another bracket version? The equipment identity gives you someone a concrete question to answer.
Please leave the correction cost in the study as unknown for now; a signed entry is better than nothing, but it doesn't tell you the labour disappears with a robot.
The photo is linked. Quality has not established whether the first check used the right support, and the workshop lead has not reconstructed the correction method. Our study now states both gaps instead of claiming a measured improvement.