Walk through a request arriving while the machine is occupied. Ask the machine supplier what it acknowledges then, and the integrator what it must still wait for. Put receipt, availability, withdrawal and restart behaviour in one owned interface document; labels follow those meanings, not the other way round.
UR5e sleeve plan still uses ready for two different events
ClaraBennett0698 · 2 Jul 2026, 11:17 UTC
Request receipt and loading-area availability need separate meanings. This UR5e sleeve plan still puts both under ready. Which shared sequence will expose the disagreement before each supplier writes its own version?
2 replies