Ask which batches used the retired gusset before bringing its correction into the new fixture. Same bracket name doesn't make the old parts equivalent.
Our bracket correction note belongs to a retired component
NinaAllen0327 · 4 Sept 2025, 10:07 UTC
14 replies
Purchasing has the change notice, but the inspection sheet only says bracket family and batch number. Need production to connect those batches to components
12 pointsThen keep the uncertain batches out of any claimed current-process average. You can still show them as history, with the missing link stated.
24 pointsWhat changed on the gusset, Nina? I would want the drawing difference before deciding whether the old correction is irrelevant or still worth investigating
15 pointsThe root clearance changed. I don't yet know whether that altered the fit-up against the old stops, so I'm not throwing the note away
18 pointsKeep the old fixture available while you compare. We found an unexpected rib on a replacement tray recently; the drawing discussion only became useful when somebody checked the real contact. Different job, same value in having the awkward bit in front of you.
16 pointsDoes the new proposal still use those old stop positions?
19 pointsYes, copied from the original fixture drawing. Designer has been asked to check them against the current gusset before freezing that layout
15 pointsThat is worth checking regardless of the old correction rate. Don't let the missing history distract everyone from a current drawing assumption you can actually examine.
8 pointsLeah's question also gives you something concrete for the former fabricator. Ask where the old gusset met the fixture and what they adjusted, rather than whether the old design was good.
6 pointsFabricator showed a fit-up aid at that root. It isn't on the fixture drawing. We've photographed it and asked quality to explain the released check separately
1 pointsHas the comparison established whether the current gusset still needs that aid, or is the fixture review waiting for sample checks?
18 pointsSample checks pending. The aid is not being copied automatically, and the old accepted figures are separated by the component history we could recover
10 pointsWho is checking the supplier's revised drawing against that decision?
14 pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .