Why do our FR5 sleeve demos start from different jobs?

JackBaker0515 · 6 Mar 2026, 19:15 UTC

Reply to discussion
JA
JackBaker0515
The dedicated-tray candidate looks quicker than the one using our incoming tray, but I would have to add re-traying and carrier storage to get that starting condition. Both suppliers say the demonstration proves suitability. What should they repeat with our actual sleeve and fixture requirements?

13 replies

AD
AdaCarter0999
Replying to JackBaker0515

Same incoming sleeves and receiving fixture for both?

6 points
JA
JackBaker0515
Replying to AdaCarter0999

Same sleeve family, not the same sample range yet. Receiving fixture also differed. I have sent the actual range and our required fixture arrangement to both.

8 points
YA
YasminBarnes0528
Replying to JackBaker0515

Good place to reset the comparison. Include loading, release and withdrawal, with the preparation and operator help made explicit. A candidate can remain worth considering with changed presentation, but price that changed job honestly.

9 points
ZA
ZaraChen1178
Replying to JackBaker0515

Who prepares the dedicated tray during ordinary production?

8 points
YA
YasminChan1050
Replying to ZaraChen1178

And who puts the empty carriers away?

19 points
JA
JackBaker0515
Replying to YasminChan1050

Our operator does both, Zara and Yasmin Chan. She will observe an ordinary order with the supervisor. Neither task appeared in the initial allowance.

9 points
YA
YasminBarnes0528
Replying to JackBaker0515

Include what she stops doing to prepare it. Carrier work can be quick by itself and still interrupt another job badly. Let her explain where the empty and full trays actually sit.

9 points
AD
AdaCarter0999
Replying to JackBaker0515

Have both suppliers agreed to the same receiving arrangement?

1 points
JA
JackBaker0515
Replying to AdaCarter0999

They have. Dedicated-tray supplier's first complete drawing clashes with our fixture on withdrawal, so its tooling revision remains open. Existing-tray candidate is ready for the agreed representative comparison.

11 points
ZA
ZaraChen1178
Replying to JackBaker0515

Keep that tooling work in its price, not in your operator's preparation allowance.

17 points
JA
JackBaker0515
Replying to JackBaker0515

Representative comparison passed for the existing-tray route, including the agreed interruption response. Dedicated route still has no completed withdrawal revision; its observed preparation also removed most of the expected benefit.

5 points
YA
YasminBarnes0528
Replying to JackBaker0515

Have you set a decision point with purchasing, Jack? The better-defined route needn't wait indefinitely for the other supplier to finish an unspecified revision.

17 points
YA
YasminChan1050
Replying to YasminBarnes0528

Did purchasing choose, or is the comparison still waiting?

22 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.