I am leaving this bracket verification unresolved. The FR10 application's job label appears before and after its restart, and the acknowledgement could belong to either attempt because the PLC and application clocks disagree.
I know not to resume from a saved number alone. Here I need to explain the gap to support without choosing whichever timestamp makes the retry look successful.
Retain the original logs and mark the acknowledgement unassigned. The within-source order may still be useful even where the clocks cannot be aligned reliably.
Ravi, that would help, provided the physical observation has its own source and time; the reused label should not be allowed to assign that observation by itself.
Ravi and Jane, the technician recorded the bracket identity after the restart, but not its condition before it. Both limits are shown separately beside the two attempts.